Project List
Hotel Saint Louis
-
Updated and maintained the color and material legend as well as the room schedule
-
Assist with red lines and markups done by project manager
-
Perform field visits to help oversee contractors
-
Assist with tours during construction
-
Design and installed all hotel signage including ADA signs as well as fire life safety signs
-
Create punch list documents and review to insure each task was completed
-
Review Marriott standards, ADA requirements and assist with other code review
-
Create CAD backgrounds and help release ASI's
The Warrior Hotel
-
Assist with red lines and markups done by project manager
-
Review Marriott standards, ADA requirements and assist with other code review
-
Work closely with project manager on floor plan and detailing
-
Use creativity to bring architectural elements to project
-
Review submittals, receive and review bids,
-
Assist with RFI's
Seven Gables Inn
-
Assist with red lines and markups done by project manager
-
Perform field visits to help oversee contractors
-
Design and installed all hotel signage including ADA signs as well as fire life safety signs
-
Create punch list documents and review to insure each task was completed
-
Review ADA requirements and assist with other code review
-
Assist with purchasing all owner provided items
-
Work closely with project manager on floor plan and detailing
-
Create CAD backgrounds and help release ASI's
Motorworks
-
Perform field visits to measure and review condition of building
-
Build model and create SD, DD, and CD documents
-
Work closely with owner, developer, and historic preservation
-
Review ADA requirements and assist with other code review
Everest Expansion
-
Meet with structural engineer to review projects
-
Layout floor plans and assist with preparing plans for permitting
-
Review ADA requirements and assist with other code review
Longbranch Condos
-
Travel to location to view existing conditions and gather measurements in order to build existing model
-
Obtain bid for proposed work
-
Research Colorado's code requirements
-
Provide Longbranch's board with a vision board of how the spaces can be used.
6011 Kingsbury Ave.
-
Meet with structural engineer to review projects
-
Layout floor plans and assist with preparing plans for permitting
-
Review ADA requirements and assist with other code review
-
Work closely with historic preservation for appoval
-
Create punch list documents and review to insure each task was completed
-
Review ADA requirements and assist with other code review
-
Work closely with project manager on floor plan and detailing
Gateway Lofts
Grove Place 3
-
Meet with contractor to review all properties
-
Build models create floor plans and CDs
-
Take drawings to city for permitting, and make adjustments accordingly
-
Review ADA requirements and assist with other code review
-
Work closely with historic preservation for appoval
-
Manage construction, and perform field visits
-
Select all appliances and finishes
-
Create a punch list and follow up to make sure work completed accurately
-
Work with vendors for all owner provided items and solicit bids